Go through the LCT ONE construction stages in Dornbirn, Austria yourself and see the movie register the process here:
grafika
grafika
grafika
grafika
 
17 / 06 / 2014   5
EE Skills and Demonstration
08 / 08 / 2013

In this thematic scope the partners of the CEC5 work on the know-how diffusion and the proof of the feasibility and the establishment of near-zero energy demand concepts in the operating environments of constructors, owners and users.

 

To achieve this, the course materials are developed for the appropriate training. The content for the 4 study books has been defined and it comprises the follwoing topics:

1. CESBA for new buildings (translated into DE, IT, PL, SI, SK, CZ, HU)

2. CESBA for Existing Buildings (translated into DE, IT, PL, SI, SK, CZ, HU)

3. CESBA for Cultural Heritage Buildings.

4. GUIDELINES on software of CESBA assessments.

The trainings will be organized by partners to educate professionals and low emission / passive buildings users as to their specifics and to the need of assessment and careful planning. The focus will be on the tool that has been elaborated on within the CEC5 initiative, namely the CESBA  tool. In order to prove the need for low emission high quality buildings and to see how the CESBA tool works in practice, partners are building / modernising their demonstration buildings. The demonstration investments are ongoing - the opening of floor module 3 is ready for Vorarlberg with the exhibition held on the 20.06.2013. Vysocina In Lidman started the construction of the buildings with some minor changes to design yet with no effects on energy efficiency.

Ludwigsburg has prepared the tendering in April 2013 and the concept of the energy efficient building was further optimized and presented to the city council.

Udine in December 2012 the public tender of first part of intervention was prepared and finished with the winner in March 2013. Right now the the administrative process of validation is on-going.

Bydgoszcz started the construction in July 2013.

PRC Soca Valley organized a workshop on the acceptability of technical interventions with local architects and a 2nd expert workshop where the concept of refurbishment was presented. Currently, the refurbishment plans are elaborated and will be in public procurement process soon.

In TTSK Trnava the winning bidder investigated the Demonstration Building with the representatives and discussed the overall technical solution before signing the contract in March 2013.

The demonstration results need to be seen and promoted and hebnce the transnational level exhibition concept was worked out by the LP and for each Demonstration Building the partners have prepared their national exhibition adaptations.

Model assessments  are on-going.

PDF
PRINT
BACK
HAVE YOUR
SAY